Two Lines, Every Step on the Record

One rolling line for sheet, plate and coil in six main stages — and one finishing line for battery terminal rod Φ18 in twelve documented operations. Parameters, QC gates and equipment are listed in full so an audit can be checked off step by step.

Line A

Aluminium Sheet, Plate & Coil — Six Main Stages

What decides performance is the temper as much as the grade. Every annealing and cold-reduction combination ends in one specific condition: O, H1x, H2x, H3x, T4 or T6.

1

Melting & Casting

Charge make-up, melting at 700–750 °C, refining for degassing and dross removal, on-line spectrometer check, cast into slab.

2

Homogenising

Soaking in the homogenising furnace removes segregation and casting stress before hot rolling.

3

Hot Rolling

Reheated slab broken down on the hot mill into plate or hot-rolled coil.

4

Cold Rolling

Cold reduced to target gauge; reduction ratio sets the work-hardening level, with closed-loop thickness control.

5

Annealing & Temper

Softening to O in batch or continuous annealers; T6 solution treatment for 6xxx; H116 / H321 stabilising anneal for 5xxx.

6

Finishing & Inspection

Tension levelling, slitting, shearing, filming or brushing; tensile, hardness and thickness reported for every batch.

Note: Melting temperature and annealing schedules shown are typical process windows. Actual parameters are set per grade and per customer standard; the Mill Test Certificate shipped with the goods prevails.
Line B

Battery Terminal Rod Φ18 — Twelve Operations

Aluminium coil rod in, finished Φ18 rod out. Three operations are controlled as critical characteristics (CC), three positions carry inspection gates (QC). Finished diameter tolerance is per order — ±0.05 mm as standard.

1
Raw Material

Coil rod / billet receiving, grade & heat number verified

CC
2
Melting

700–750 °C, refining & degassing, spectrometer recheck

3
Water / Air Cooling

Water quench then air blow-dry, set and dry

4
Straightening

Straightener removes bending stress; ≤1 mm/m

5
Brush De-scaling

Removes oxide skin and burrs

QC1
6
Ultrasonic Cleaning

25–40 kHz, 40–60 °C, 3–5 min: de-oil & de-chip

7
Air Drying

Blow-dry before extrusion, no water film

CC
8
Horizontal Extrusion

Steady temperature, pressure & speed; uniform section

CC
9
Precision Drawing

Sized through Φ18 die, ample drawing lubricant

QC2
10
Material Inspection

Dimension, surface, mechanical & physical testing

11
Coiling

Coiled neat, each coil tagged with batch number

12
Final Inspection & Packing

Final check, stretch film & strapping, warehoused

Raw material Pre-treatment / cooling Critical characteristic (CC) Inspection gate (QC) Finished goods

Operation Parameters & Acceptance Criteria

Operation Key Parameters Inspection Item Acceptance Criteria Non-conformance Action
1. Raw material Grade per order (1060 / 6063); no heavy oil, scratches Mill cert, surface, diameter Matches order grade and size Return / concession review
2. Melting (CC) 700–750 °C by grade; refining & degassing Composition, furnace log Spectrometer result within grade limits Composition adjustment / re-melt
3. Water / air cooling Water 20–40 °C, exit ≤50 °C No water stain, no overheating Dry, no oxidation colour Isolate & rework
4. Straightening Roll gap set to material diameter Straightness, no roll marks ≤1 mm/m Re-straighten
5. Brush de-scaling Moderate brush pressure Surface cleanliness Uniform, scratch-free Adjust & re-brush
6. Ultrasonic cleaning (QC1) 25–40 kHz, 40–60 °C, 3–5 min White-glove wipe test No visible oil or black residue Re-wash
8. Extrusion (CC) Set by die and by grade OD, straightness, surface Uniform section, no cracks or blisters Scrap, trace to die
9. Precision drawing (CC / QC2) Φ18 die; tolerance per order (±0.05 mm std) OD, roundness, surface finish Φ18 within tolerance, no scratches Scrap if out; trace to drawing die
10. Material inspection (QC3) Per GB/T or customer standard 100% dimensional, sampled mechanical Conforms to order and standard Isolate & review; rework if feasible
12. Final inspection & packing Label: grade, size, batch, qty, date Complete labelling, secure packing Label matches goods Re-label

Line B — Equipment List

Equipment Purpose Daily Check Points
Pay-off standRaw material feedFree rotation, no jamming
StraightenerStraighteningRoll wear, gap setting
Brushing machineSurface de-scalingBrush wear, pressure
Ultrasonic cleanerDe-oil & de-chipPower, bath concentration, temperature
Air-cooling sectionSurface dryingAir pressure, nozzle blockage
Horizontal extruder + dieExtrusionDie wear, temperature, pressure
Melting furnaceMelting & composition controlFurnace temp, flux, degassing unit
Water tank / air sectionCooling & settingWater temp & level, air pressure
Drawing bench + Φ18 diePrecision sizingDie bore, drawing lubricant
CoilerCoilingNeat traverse, tension

Three Critical Characteristics

  • Melting — composition and temperature decide everything downstream; no tapping until the spectrometer passes.
  • Extrusion — temperature, pressure and speed must be steady, or OD and surface fail together.
  • Precision drawing — the final Φ18 sizing gate; die wear shows up directly in finished tolerance.

Three Inspection Gates

  • QC1 after cleaning — white-glove wipe; no oil or black residue.
  • QC2 after drawing — Φ18 OD, roundness, surface finish.
  • QC3 material inspection — 100% dimensional and visual, sampled mechanical.
Traceability

Every Batch Can Be Traced Backwards

A mandatory item in any automotive-chain audit. We run electronic batch-level records as standard and upgrade to piece-level traceability under IATF 16949.

R1

Heat Number

Heat number, die number, operator and inspection data recorded for every batch and retrievable with the shipment.

R2

Record Retention

Incoming, process, extrusion and melting records kept 1–2 years; final inspection data archived long term.

R3

Mill Test Certificate

MTC issued with every shipment: chemical composition, mechanical properties and measured dimensions.

R4

Third-party Witness

SGS, BV and Intertek inspections accepted on site; container loading can be video-witnessed.

Want the Full Process Documentation Pack?

We can send the process flow chart, control plan and inspection report templates together with the quotation — everything you need for supplier approval.

We reply within 24 hours. You can also reach us directly on WhatsApp.
Chat on WhatsApp · 24h